跳至主要內容
:::

所有條文 Article Content

法規名稱(Title) Type I Telecommunications Business Point to Point Microwave Base Station RF Equipment Type Approval Technical Specifications Ch
修正日期(Amended Date) 2007.07.20
1
1.The technical specifications of Type Approval is established pursuant to Regulations Governing Fixed Network Telecommunications Business, article 33 item 2.
2
2. Responsible Organization: National Communications Commission (herein after refer to as NCC)
Reception Agency: Technical Administration Department, NCC
Testing Agency: The testing labs of government agencies, non-profit organizations, or registered companies that are approved by the NCC, or the testing labs that are approved by foreign approval institutions.
3
3. Applicable base station RF equipment:
This type approval regulation is applicable to type I telecommunications business point to point microwave RF equipment type approval.
4
4. Application Inspection Procedures:
4.1 Applicant shall provide equipment to the testing lab for a sample testing and receiving a testing report. Testing report shall minimally include basic testing items listed in section 6 and the test results shall be compliant with these testing items. For any bilateral agreements among countries, regional organizations or international organizations or multi-parties telecommunications equipment mutually recognized agreement approved by the Taiwan Government, NCC could review the test report prepared/issued under these agreements for application.
4.2 Applicant shall prepare identification IDs and document as listed in section 5 and submit his application to the reception agency for processing.
4.3 The inspection flow chart of type approval is listed in Appendix 1.
5
5. Required IDs and documents for type approval of the base station RF equipment:
5.1 Type approval inspection application form (see Appendix 2)
5.2 Photo copy of applicant's related IDs:
(1). For domestic manufactured products:
If the applicant is an equipment manufacturer, the applicant shall submit his operation license for the controlled telecommunications RF equipment. If the applicant is an equipment distributor/agent, the applicant shall submit his distributor/agent license and operation license for the controlled telecommunications RF equipment.
(2). For imported products:
The equipment import distributor/agent shall submit his company license, business registration license, operation license for the controlled telecommunications RF equipment, telecommunications equipment import license, or special permission license.
5.3 Equipment submitted for inspection related document:
(1). One original and one copied testing report. The original testing report will be returned after inspection.
(2). One copy of user manuals (or operation manuals) and specifications document.
(3). Equipment category and four (4) 4x6" or larger full equipment/product color photographs. (must clearly show brand name, and model)
(4). One copy of the circuit block diagram or circuit diagram.
6
6. Basic testing items and technical specifications:
6.1 Basic testing items and technical specifications for base station RF equipment are listed in Appendix 3.
6.2 If the equipment submitted for approval has adapted the latest technology or standards generated by foreign standard institutions, but Appendix 3 does not list the basic functional test items for the equipment, or the test results do not comply with the technical specifications listed in Appendix 3. The applicant could submit complete technical documents or standard technical specifications generated by foreign standard institution together with test reports according to section 4.1 to the reception agency for further review and final acceptance.
7
7. Inspection Fee:
Inspection fee shall be collected in accordance with the price listed in the fixed communications business administration guideline. Applicant shall submit the application form to the reception agency. After receiving invoice from the reception agency, the applicant shall give the payment to the Financial Division of the secretary office, NCC. There will be no refund after the payment.
8
8. Approval license issuance:
Once the submitted IDs and documents are reviewed and are found to be compliant with all regulations, an approval license as listed in Appendix 4 will be issued to the applicant.
9
9. Approval license termination/cancellation and other administration issues will be in accordance with the "Telecommunications restricted equipment approval and inspection guidelines" and the "Telecommunications restricted RF equipment administration guidelines" regulations.
10
10. Others:
10.1 Inspection application shall be submitted based on a single manufacturer model. For those products that belong to the same product family, the inspection application shall be combined. However, different models and functions equipment shall be submitted in different applications.
10.2 Different models and functions products shall be submitted in separate inspection applications.
10.3 The reception agency reserves the right to ask the applicant to provide equipment for inspection.
10.4 If the reception agency has questions on the test report prepared by a foreign test laboratory, the reception agency reserves the right to ask the applicant to resubmit the equipment to other domestic or foreign testing labs for a retest. The applicant will pay for the retest expenses.
10.5 For the equipment approved by the reception agency, the applicant shall follow the approval sticker example printed in the approved license to replicate additional stickers to attach to the equipment or to engrave the sticker on the equipment at an appropriate place.
10.6 If the design of approved equipment is modified, this equipment shall be resubmitted for inspection. However, if the modification was only limited to its appearance (such as color) and its model and functionality were not changed, then if the reception agency agrees, there is no need for reapplication.
10.7 Import, sale, installation, and ownership of the approved equipment shall be compliant with any related telecommunications regulations.
10.8 NCC shall be notified once the applicant changes his address.
11
11. Effective Date:
The technical specifications of type approval shall come into force from the date of promulgation. Revision of the document will also follow this rule.